Weekly MUST Budget
Reduced - Practicals
8.0h / 10.0h cap
Hour Calibration
actual hours logged
Rule: slippage > 1.25x triggers Scope-Cut Rung 2
Week Execution
0%
0/ 9 tasks
0.0h
target
Target Output
Week Objective & Target Output
REDUCED CAPACITY (Practicals: Oct 26–Nov 6) — October 26 – November 1, 2026. Practicals (Oct 26–Nov 6) — capacity 10h MUST. Focus: Arrays Medium II; DBMS Foundations & ER Modeling; MIT Missing Semester: Git Mastery.
MUST — Critical Path
4 Tasks • ~8.0h
DSA (Java)
2 tasks
DSA
Arrays Medium II
3 problems
Next Permutation, Leaders in an Array, Longest Consecutive Sequence. TUF+ A2Z Step 3.2
3.0h
DSA
DSA Transfer: No-Hint Timed Medium Set (Permutations & Sequences)
2 problems
LC #
Sit 2 unseen Medium problems you have never attempted (pick from the LeetCode topic tag, NeetCode “similar questions” or a company list; never a problem named in any learning task), at least 72 h after the learning task — move the set to the first half of next week if needed. Format: 25 min per problem (35 min for a Hard), including 5 min for edge cases and a dry run; no hints, no AI. Pass bar: ≥ 1/2 solved inside the time box; on a miss, log the miss reason in the Journal and re-sit a fresh pair within 7 days.
1.5h
Core CS (DBMS)
1 tasks
DBMS
DBMS Foundations & ER Modeling
File system vs DBMS, 3-tier architecture, ER modeling, entities, relationships, mapping cardinality. TUF+ DBMS
1.5h
Core CS (Linux & Git)
1 tasks
GIT
MIT Missing Semester: Git Mastery
Git data model (DAG, blobs, trees, commits), branching, merging, merge conflicts, interactive rebase (
git rebase -i), cherry-picking. Architecture §6.4
2.0h
SHOULD — Depth & Mastery
(3 Tasks)
CORE
3Blue1Brown LinAlg Eps 5–8
Matrix multiplication as composition, determinant, inverse matrices.
2.0h
DSA
Rearrange Array Elements by Sign
Alternating positive and negative elements. TUF+ A2Z Step 3.2
1.5h
APT
Quant M4
Pipes & Cisterns (Basic + Advanced).
1.5h
STRETCH — If Ahead
(2 Tasks)
GIT
Interactive Git Practice
Complete LearnGitBranching interactive visual challenges.
1.5h
CORE
Hacktoberfest Pull Request
Open one documentation/test PR on any public Java or Spring project (Hacktoberfest-eligible, [VERIFY] 2026 rules) as a warm-up for the First Open-Source Contribution.
1.5h
verified_user
0 / 5 Cleared
Weekly Clearance Gate
[T: Arrays Medium II]
DSA: Have you completed “Arrays Medium II” (Next Permutation, Leaders in an Array, Longest Consecutive Sequence)?
Evidence: one problem from this task re-solved cold in ≤ 25 min a week later, logged in the Journal.
[T: DBMS Foundations & ER Modeling]
DBMS: Have you completed “DBMS Foundations & ER Modeling” (File system vs DBMS, 3-tier architecture, ER modeling, entities, relationships, mapping…)?
Evidence: written answers in your notes repo.
[T: MIT Missing Semester: Git Mastery]
Have you completed “MIT Missing Semester: Git Mastery” (Git data model (DAG, blobs, trees, commits), branching, merging, merge conflicts,…)?
Evidence: terminal transcript or repo link.
[T: DSA Transfer: No-Hint Timed Medium Set (Permutations & Sequences)]
DSA: Did you pass “DSA Transfer: No-Hint Timed Medium Set (Permutations & Sequences)” — 2 unseen Medium problems, 25 min per problem, no hints, pass bar ≥ 1/2 solved?
Evidence: timed result and miss reasons logged in the Journal.
Health & Guardrails: 1 full rest day taken every 2 weeks?
tune
Triage Rule
If Behind / Life Interruption Protocol
When academic exams spike or weekly time slips, execute this contingency plan:
shield Protect (Non-Negotiable)
Arrays Medium II
schedule Defer (Safe to Shift)
3Blue1Brown LinAlg Eps 5–8 → weekend; DSA: Rearrange Array Elements by Sign → Week 5
edit_note
Week 04 Technical Notes & Journal
#LeetCode
#Java
#DSA
#Week04