Weekly MUST Budget
Standard
27.0h / 27.0h cap
Hour Calibration
actual hours logged
Rule: slippage > 1.25x triggers Scope-Cut Rung 2
Week Execution
0%
0/ 19 tasks
0.0h
target
Target Output
Week Objective & Target Output
January 11 – January 17, 2027 — Focus: DSA Comprehensive Recall Sprint; Graphs Foundations & Traversals; Graph Connected Components & Cycles; DP 1D Foundations; OS Complete Revision & Interview Drill.
MUST — Critical Path
12 Tasks • ~27.0h
DSA (Java)
6 tasks
DSA
DSA Comprehensive Recall Sprint
5 problems
5 random medium problems across Arrays, Hashing, Binary Search, Linked Lists, Trees and Graphs without hints, followed by the Phase 3 ledger checkpoint. Ledger checkpoint: ≥ 170 unique problems logged in the Journal (cumulative; tracked metric, Architecture §3).
3.0h
DSA
Graphs Foundations & Traversals
3 problems
Graph representation (Adjacency Matrix vs Adjacency List in Java), Breadth First Search (BFS), Depth First Search (DFS). TUF+ A2Z Step 15.1
3.5h
DSA
Graph Connected Components & Cycles
6 problems
Number of Provinces, Connected Components, Detect Cycle in Undirected Graph (BFS & DFS), Number of Islands, Flood Fill, 0/1 Matrix. TUF+ A2Z Step 15.2
3.5h
DSA
DSA Transfer: No-Hint Timed Graph Set (Components & Islands)
2 problems
LC #
Sit 2 unseen Graph problems you have never attempted (pick from the LeetCode topic tag, NeetCode “similar questions” or a company list; never a problem named in any learning task), at least 72 h after the learning task — move the set to the first half of next week if needed. Format: 25 min per problem (35 min for a Hard), including 5 min for edge cases and a dry run; no hints, no AI. Pass bar: ≥ 1/2 solved inside the time box; on a miss, log the miss reason in the Journal and re-sit a fresh pair within 7 days.
1.5h
DSA
DP 1D Foundations
4 problems
Introduction to DP (overlapping subproblems, optimal substructure, memoization vs tabulation vs space optimization), Climbing Stairs, Frog Jump, Frog Jump with K Distances, Maximum Sum of Non-Adjacent Elements (House Robber I & II). TUF+ A2Z Step 16.1-16.2
3.5h
DSA
DSA Daily Quota (Week 15)
4 problems
Solve 4 new problems from NeetCode 150 — Trees (Pass 2); time-box each at 25 min before any hint (2.5h includes editorial on misses), then log pattern and miss reason in the Journal. Never repeat a problem already in the ledger.
2.5h
Competitive Programming
1 tasks
CP
Contest & Upsolving (Week 15)
LC #
LeetCode Weekly Contest (+ Codeforces Div.2/3 when it fits) and mandatory upsolving within 48 h.
2.5h
Core CS (OS)
1 tasks
OS
OS Complete Revision & Interview Drill
Revise process synchronization, virtual memory, paging, thrashing, and deadlock conditions. TUF+ OS
2.5h
Recruiting Pipeline
1 tasks
PIPELINE
Recruiting Pipeline Weekly (Week 15)
Calendar check against the Opportunity Calendar (Architecture §16); send ≥ 3 personalised outreach messages (alumni, seniors, recruiters) and log each in the Tracker; follow up open threads; ask for a referral 1–2 days after any OA invite; apply within 72 h of any new posting on the Target-40.
1.0h
Mock Interviews
1 tasks
MOCK
Mock Interview 2 (Behavioural — STAR & LP Mapping)
30-min behavioural mock on your 5 STAR stories plus two Amazon LP questions; get a peer to score. Rubric: Behavioural (Architecture §15.4: STAR + LP mapping + quantification + brevity).
1.0h
Aptitude
1 tasks
APT
Aptitude Timed Drill (Week 15)
25-minute timed mixed set (quant, logical reasoning, data interpretation) from IndiaBix / PrepInsta-style banks; log accuracy and seconds per question in the Tracker. Target: ≥ 70% accuracy by W28.
0.5h
Core CS (LLD)
1 tasks
LLD
Machine-Coding Primer 1 (90 min): Snake & Ladder
Build a working console Snake & Ladder in Java inside 90 minutes: entities, interfaces, a game loop, 3 unit tests. Then a 30-minute self-review against Architecture §15.2 and, where possible, a code review from a senior who has sat Flipkart / PhonePe / Swiggy machine-coding rounds. Resource: Refactoring Guru patterns catalogue.
2.0h
SHOULD — Depth & Mastery
(5 Tasks)
CORE
Aditya Verma Sliding Window Preview
Watch first 3 videos on sliding window concepts in preparation for Phase 4.
2.0h
DSA
DSA Spaced Re-Solve (Week 15)
Re-solve 3 hard linked list problems from Week 14.
1.5h
OS
Model Evaluation & Cross-Validation Protocols
Stratified K-Fold, TimeSeriesSplit, data leakage prevention, ROC-AUC calibration, learning curves.
2.0h
APT
Quant M15 & Logical L10
Mensuration & Syllogisms. Complete Aptitude Phase 1 syllabus!
2.0h
APT
Quant M6–M7
Time & Work, Time Speed Distance (Basic + Advanced).
2.0h
STRETCH — If Ahead
(2 Tasks)
CORE
Kaggle Notebook Discussion
Write a structured summary of your competition approach in the Kaggle competition discussion forum to earn community upvotes. Architecture §6.3
1.5h
CORE
Kaggle Competition Sprint
Optional stretch: end-to-end tabular pipeline on a live Kaggle competition (feature engineering, LightGBM/XGBoost baseline, 5-fold CV, Optuna) and a documented notebook. Not a gate; the Kaggle protocol requires only the EDA, CNN and RAG notebooks.
6.0h
verified_user
0 / 12 Cleared
Weekly Clearance Gate
[T: DSA Comprehensive Recall Sprint]
DSA: Have you completed “DSA Comprehensive Recall Sprint” (5 random medium problems across Arrays, Hashing, Binary Search, Linked Lists, Trees and…)?
Evidence: one problem from this task re-solved cold in ≤ 25 min a week later, logged in the Journal.
[T: Graphs Foundations & Traversals]
DSA: Have you completed “Graphs Foundations & Traversals” (Graph representation (Adjacency Matrix vs Adjacency List in Java), Breadth First Search…)?
Evidence: one problem from this task re-solved cold in ≤ 25 min a week later, logged in the Journal.
[T: Graph Connected Components & Cycles]
DSA: Have you completed “Graph Connected Components & Cycles” (Number of Provinces, Connected Components, Detect Cycle in Undirected Graph (BFS & DFS),…)?
Evidence: one problem from this task re-solved cold in ≤ 25 min a week later, logged in the Journal.
[T: DP 1D Foundations]
DSA: Have you completed “DP 1D Foundations” (Introduction to DP (overlapping subproblems, optimal substructure, memoization vs…)?
Evidence: one problem from this task re-solved cold in ≤ 25 min a week later, logged in the Journal.
[T: OS Complete Revision & Interview Drill]
OS: Have you completed “OS Complete Revision & Interview Drill” (Revise process synchronization, virtual memory, paging, thrashing, and deadlock conditions)?
Evidence: written answers in your notes repo.
[T: Recruiting Pipeline Weekly (Week 15)]
Recruiting Pipeline: Have you completed “Recruiting Pipeline Weekly (Week 15)” (Calendar check against the Opportunity Calendar (Architecture §16); send ≥ 3 personalised…)?
Evidence: Tracker log shows ≥ 3 personalised outreach messages this week.
[T: Binary Search on Answers II]
DSA: Can you solve “Book Allocation” and “Aggressive Cows” from the Binary Search on Answers II set in Java?
Evidence: one problem from this task re-solved cold in ≤ 25 min a week later, logged in the Journal.
[T: LeetCode SQL 50 (Part 3: Questions 35–50) — SQL 100% MILESTONE]
SQL: Have you completed “LeetCode SQL 50 (Part 3: Questions 35–50) — SQL 100% MILESTONE” (Subqueries, Window Functions (
ROW_NUMBER, RANK, DENSE_RANK, LEAD, LAG),…)?
Evidence: LeetCode SQL submission count.
[T: DSA Comprehensive Recall Sprint]
Ledger: Does your Journal show ≥ 170 unique problems logged (cumulative)?
Evidence: Journal ledger count and LeetCode submission links.
[T: Mock Interview 2 (Behavioural — STAR & LP Mapping)]
Mocks: Have you completed 2 total mock interviews with rubric sheets recorded?
Evidence: rubric sheets for mocks 1–2 saved in Journal.
[T: DSA Transfer: No-Hint Timed Graph Set (Components & Islands)]
DSA: Did you pass “DSA Transfer: No-Hint Timed Graph Set (Components & Islands)” — 2 unseen Graph problems, 25 min per problem, no hints, pass bar ≥ 1/2 solved?
Evidence: timed result and miss reasons logged in the Journal.
Health & Guardrails: 1 full rest day taken every 2 weeks?
tune
Triage Rule
If Behind / Life Interruption Protocol
When academic exams spike or weekly time slips, execute this contingency plan:
shield Protect (Non-Negotiable)
DSA Comprehensive Recall Sprint + Recruiting Pipeline Weekly (Week 15)
schedule Defer (Safe to Shift)
Aditya Verma Sliding Window Preview → weekend; DSA Spaced Re-Solve (Week 15) → Week 16
edit_note
Week 15 Technical Notes & Journal
#LeetCode
#Java
#DSA
#Week15