Weekly MUST Budget
Standard
25.0h / 27.0h cap
Hour Calibration
actual hours logged
Rule: slippage > 1.25x triggers Scope-Cut Rung 2
Week Execution
0%
0/ 20 tasks
0.0h
target
Target Output
Week Objective & Target Output
February 1 – February 7, 2027 — Focus: Binary Trees Medium FAQs; Binary Trees Ancestor & Paths; Build
micrograd from Scratch (Part 2: The Neural Net); Testing Spring Apps: JUnit 5, Mockito, MockMvc, Testcontainers; CN Transport Layer.MUST — Critical Path
11 Tasks • ~25.0h
DSA (Java)
5 tasks
DSA
Binary Trees Medium FAQs
6 problems
Zigzag Traversal, Boundary Traversal, Vertical Order Traversal, Top View, Bottom View, Right/Left View. TUF+ A2Z Step 13.2
3.5h
DSA
Binary Trees Ancestor & Paths
4 problems
LC #A
Path to Given Node, Lowest Common Ancestor (LCA), Maximum Width of Binary Tree, Children Sum Property. TUF+ A2Z Step 13.2
3.5h
DSA
DSA Transfer: No-Hint Timed Tree FAQs Set
2 problems
LC #
Sit 2 unseen Tree FAQs problems you have never attempted (pick from the LeetCode topic tag, NeetCode “similar questions” or a company list; never a problem named in any learning task), at least 72 h after the learning task — move the set to the first half of next week if needed. Format: 25 min per problem (35 min for a Hard), including 5 min for edge cases and a dry run; no hints, no AI. Pass bar: ≥ 1/2 solved inside the time box; on a miss, log the miss reason in the Journal and re-sit a fresh pair within 7 days.
1.5h
DSA
DP 1D Part II: Interview Staples
4 problems
LC #213
House Robber II (LC #213), Decode Ways (LC #91), Word Break (LC #139), Perfect Squares (LC #279). First DP revisit three weeks after DP 1D Foundations: write recurrence → memo → tabulation → space-optimised for each.
2.0h
DSA
DSA Daily Quota (Week 18)
4 problems
Solve 4 new problems from NeetCode 150 — Two Pointers & Binary Search (Pass 2); time-box each at 25 min before any hint (2.5h includes editorial on misses), then log pattern and miss reason in the Journal. Never repeat a problem already in the ledger.
2.5h
Competitive Programming
1 tasks
CP
Contest & Upsolving (Week 18)
LC #
LeetCode Weekly Contest (+ Codeforces Div.2/3 when it fits) and mandatory upsolving within 48 h.
2.5h
Backend (Spring Boot)
1 tasks
SPRING
Testing Spring Apps: JUnit 5, Mockito, MockMvc, Testcontainers
Unit-test services with JUnit 5 + Mockito, slice-test controllers with MockMvc, and integration-test repositories against a Testcontainers PostgreSQL. Capstone milestone 3: ≥ 10 meaningful tests green in CI later. Why: backend interviews and real teams expect tested code.
3.0h
Core CS (CN)
1 tasks
CN
CN Transport Layer
Port numbers, UDP vs TCP, TCP 3-way handshake, TCP 4-way termination, TCP segment structure, Reliability (sequence numbers, ACKs), Flow Control (Sliding Window), Congestion Control (Slow Start, Congestion Avoidance, Fast Retransmit, Fast Recovery). TUF+ CN
3.0h
Recruiting Pipeline
1 tasks
PIPELINE
Recruiting Pipeline Weekly (Week 18)
Calendar check against the Opportunity Calendar (Architecture §16); send ≥ 3 personalised outreach messages (alumni, seniors, recruiters) and log each in the Tracker; follow up open threads; ask for a referral 1–2 days after any OA invite; apply within 72 h of any new posting on the Target-40.
1.0h
Mock Interviews
1 tasks
MOCK
Mock Interview 3 (Java & CS Fundamentals Grill)
60-min grill on Java collections/concurrency, OOPs, DBMS, OS and CN with depth-ladder follow-ups. Rubric: Java/CS grill (Architecture §15.5: accuracy + depth ladder + trade-offs).
2.0h
Aptitude
1 tasks
APT
Aptitude Timed Drill (Week 18)
25-minute timed mixed set (quant, logical reasoning, data interpretation) from IndiaBix / PrepInsta-style banks; log accuracy and seconds per question in the Tracker. Target: ≥ 70% accuracy by W28.
0.5h
SHOULD — Depth & Mastery
(8 Tasks)
CORE
Structuring ML Projects)
Train/Dev/Test distributions, Error Analysis, Human-level performance baseline, Transfer Learning.
2.0h
CN
Andrew Ng DL Course 4 (Convolutional Neural Networks)
Video lectures on conv layers, pooling, stride, padding.
3.0h
CORE
Problem-Solving Journal Spaced Review (Week 18)
Re-solve 3 tagged stack and two-pointer problems.
2.0h
APT
Quant M18
Speed, Distance & Races.
1.5h
CORE
Company Research Database Updates (Week 18)
Compile core tech stack requirements for Track B banks (JPMorgan, Goldman Sachs, Morgan Stanley).
1.5h
CORE
Neural Networks & Deep Learning)
Neural networks foundations, vectorization, computational graphs, activation functions, shallow and deep neural network forward/backprop. Architecture §6.2
4.5h
CORE
Improving Deep Neural Networks)
Hyperparameter tuning, weight initialization, L2 regularization, dropout, Batch Normalization, Adam optimizer.
3.5h
AI/ML
The Engine)
Implement
Value scalar class in pure Python: store data, grad, _prev children, and _op. Implement +, , relu, and backward pass using chain rule and topological DAG sort. Architecture §6.1*
3.0h
STRETCH — If Ahead
(1 Tasks)
OS
Kurose & Ross Chapter 3
Transport Layer reading on TCP Reno vs Tahoe.
2.0h
verified_user
0 / 8 Cleared
Weekly Clearance Gate
[T: Binary Trees Medium FAQs]
DSA: Have you completed “Binary Trees Medium FAQs” (Zigzag Traversal, Boundary Traversal, Vertical Order Traversal, Top View, Bottom View,…)?
Evidence: one problem from this task re-solved cold in ≤ 25 min a week later, logged in the Journal.
[T: Binary Trees Ancestor & Paths]
Can you implement Lowest Common Ancestor (LCA) in a Binary Tree in Java in under 15 minutes?
Evidence: one problem from this task re-solved cold in ≤ 25 min a week later, logged in the Journal.
[T: Testing Spring Apps: JUnit 5, Mockito, MockMvc, Testcontainers]
Backend: Have you completed “Testing Spring Apps: JUnit 5, Mockito, MockMvc, Testcontainers” (Unit-test services with JUnit 5 + Mockito, slice-test controllers with MockMvc, and…)?
Evidence: GitHub PR link with passing CI run.
[T: CN Transport Layer]
CN: Have you completed “CN Transport Layer” (Port numbers, UDP vs TCP, TCP 3-way handshake, TCP 4-way termination, TCP segment…)?
Evidence: written answers in your notes repo.
[T: Recruiting Pipeline Weekly (Week 18)]
Recruiting Pipeline: Have you completed “Recruiting Pipeline Weekly (Week 18)” (Calendar check against the Opportunity Calendar (Architecture §16); send ≥ 3 personalised…)?
Evidence: Tracker log shows ≥ 3 personalised outreach messages this week.
[T: Mock Interview 3 (Java & CS Fundamentals Grill)]
Have you completed “Mock Interview 3 (Java & CS Fundamentals Grill)” (60-min grill on Java collections/concurrency, OOPs, DBMS, OS and CN with depth-ladder…)?
Evidence: rubric sheet saved in Journal.
[T: DSA Transfer: No-Hint Timed Tree FAQs Set]
DSA: Did you pass “DSA Transfer: No-Hint Timed Tree FAQs Set” — 2 unseen Tree FAQs problems, 25 min per problem, no hints, pass bar ≥ 1/2 solved?
Evidence: timed result and miss reasons logged in the Journal.
Health & Guardrails: 1 full rest day taken every 2 weeks?
tune
Triage Rule
If Behind / Life Interruption Protocol
When academic exams spike or weekly time slips, execute this contingency plan:
shield Protect (Non-Negotiable)
Binary Trees Medium FAQs + Build
micrograd from Scratch (Part 2: The Neural Net) + Recruiting Pipeline Weekly (Week 18)
schedule Defer (Safe to Shift)
Andrew Ng DL (Course 3: Structuring ML Projects) → weekend; Andrew Ng DL Course 4 (Convolutional Neural Networks) → Week 19
edit_note
Week 18 Technical Notes & Journal
#LeetCode
#Java
#DSA
#Week18